The following is the complete content of the equipment maintenance service plan,
which can be adjusted according to the needs of machine conditions:
- Clean the spindle cooling fan
- Check the spindle pull force is within the normal range
- Check that the coolant is available in sufficient quantity.
- Check the air pressure is in normal working.
- Check the air blowing in the inner cone hole of the spindle is normal, wipe with a clean cotton cloth, and spray with light ends.
- Clean the tool magazine, arms, cutters and claws.
- Check the hydraulic pipe with no leakage.
- Clean the air filter, cooling pump and lubricating oil pump filter of the heat exchanger.
- Check offset of machine coordinate origin of the three-axis.
- Check the tool magazine that can work smoothly in changing or rotating of tool arms and cutters.
- Check the oil of oil cooler, fill the oil if it’s below the dividing line.
- Clean the impurities and water in the compressed air, check the oil quantity and each valve is in normal work Check the tightness of the pneumatic system. The quality of the air path system directly affects the tool change and lubrication system.
- To detect the lubrication of the shaft track, the track surface must be ensure in good lubrication.
- Check and clean the limit switch and the cam.
- Check the oil of the cylinder is available in sufficient quantity.
- Check the servomotor and head of each axis are running normally and whether there is any abnormal sound.
- Test the clearance of each shaft and adjust the compensation amount if necessary.
- Check all signal lights and all buttons are in normal working.
- Horizontal correction
- Clean the cutting water tank and replace the cutting fluid
Images 1 of 9
Images 2 of 9
Images 3 of 9
Images 4 of 9
Images 5 of 9
Images 6 of 9
Images 7 of 9
Images 8 of 9
Images 9 of 9
